Proccess safety BEACON – JULY 2022

Proccess safety BEACON – JULY 2022

A plant experienced a piping leak and could not shutdown to properly repair it. Using their leak clamp procedure, they consulted the required experts and approved use of a temporary clamp for 6 months. After that time, the status of the clamp was to be reviewed,...